Projects
Glengormley Nursing Home
The nursing home was constructed on a significantly sloping site. To facilitate the design a 5m high reinforced concrete retaining wall was designed and constructed to the rear of the property before the building could be constructed. The structure for the home was load bearing masonry on ground bearing foundations.